Bussy Road Clearing – October 2025
Bussy Rd ditches and low-hanging limbs and branches have been trimmed and cleared.
Blake Street Clearing – August 2025
The Blake St. ditches and Right-of-way have been cleared of brush.
Sidewalk Repair along Hwys 208 & 85 – Summer 2025 – completed.
All sidewalks have been repaired and curbs removed along Hwys 208 & 85. Repairs were also made along Jordan Dr. and Ridgeway Rd.
Walking Trail Light Conversion – Spring 2025
The Walking Trail lights Have been replaced with LED Lantern style fixtures.
Oneal Drive Repaving – September 2024
Oneal Dr was milled and repaved from Pitts Dr to Jordan Dr ” The Business District”. This included restriping the street and the parking places.
Ridgeway Rd Repairs- Sept. 2023 – January 2024
Ridgeway Road had areas repaired and then the road has been restriped.
New Crosswalks on Walking Trail – January 2024
New “Piano Key” style crosswalks have been installed where the Walking Trail crosses city streets.
Street Sign Replacement Project – March – Winter 2024
We are in the process of replacing all of the street signs in the city. The new signs are 9″, high-intensity prismatic aluminum signs that meet the latest gov. standards for visibility and size.
Current project – updating traffic signs that are faded or missing.
Street Lights have been converted to LED– Project 100% complete Feb 15, 2023